Signage: Aéroport de Paris - Aéroport Charles de Gaulle
A new liaison building connecting the two terminals 2A and 2C was recently opened to increase, speed up and ease passenger flow and management. Changes occurring during the construction of the new liaison building impacted on different zones within the two terminals; including new arrival and connection halls.
Heading an external team assisting various departments concerned with passenger flow and signage within terminal 2 at Charles de Gaulle Airport. Responsibility included analysis and presentation of findings, proposals for alternative scenarios for provisional and permanent signage throughout numerous zones including customs, arrivals, departures, connections and services, while the planning and construction phases of the building were undertaken.